Datasheet 搜索 > DC/DC转换器 > NXP(恩智浦) > MC33FS6502LAER2 数据手册 > MC33FS6502LAER2 其他数据使用手册 1/18 页

¥ 45.897
MC33FS6502LAER2 其他数据使用手册 - NXP(恩智浦)
制造商:
NXP(恩智浦)
分类:
DC/DC转换器
封装:
LQFP-EP-48
Pictures:
3D模型
符号图
焊盘图
引脚图
产品图
页面导航:
标记信息在P1
导航目录
MC33FS6502LAER2数据手册
Page:
of 18 Go
若手册格式错乱,请下载阅览PDF原文件

Final Product Change Notification
202104038F01 : NXP Final Test Site Relocation Initiative: ATTJ to ATTJ Building 2 (ATTJ-B2) -
Phase 2 Qualification Results
Note: This notice is NXP Company Proprietary.
Issue Date: Apr 28, 2021 Effective date:May 28, 2021
Here is your personalized notification about a NXP general announcement.
For detailed information we invite you to view this notification online
Management summary
Due to the critical nature of semiconductor supply at this time, and capacity constraints at NXP ATTJ
Tianjin, China, PCN 202104038F01 for Final Test Site Relocation ATTJ to ATTJ Building 2 (ATTJ-
B2) requires an Effective Date of 30 days for supply assurance.
Change Category
[ ]Wafer
Fab
Process
[ ]Assembly
Process
[ ]Product Marking
[ ]Test
Process
[ ]Design
[ ]Wafer
Fab
Materials
[ ]Assembly
Materials
[ ]Mechanical Specification
[ ]Test
Equipment
[ ]Errata
[ ]Wafer
Fab
Location
[ ]Assembly
Location
[ ]Packing/Shipping/Labeling
[X]Test
Location
[ ]Electrical
spec./Test
coverage
[ ]Firmware
[ ]Other
PCN Overview
Description
NXP Semiconductors announces the ATTJ Final Test Site Relocation Qualification Results from the
current NXP ATTJ, Tianjin, China test site to local, nearby (2.5km away) ATTJ-B2 test site, creating
a consolidated ATTJ Test Center of Excellence. The associated Test Backend Shipping / Packing
Operations relocate to the ATTJ-B2 site as well.
This NXP Initiative is a phased / ramped relocation activity, until all Final Test platform types have
been relocated to the ATTJ-B2.
This major, strategic NXP initiative ensures future scalability of NXP ATTJ backend manufacturing
sites, ATTJ main factory and new ATTJ-B2, to support current and future business. The current
ATTJ main factory manufacturing floor space is fully utilized. Final Test and Test Backend Shipping /
Packing Operations must be migrated to the new ATTJ-B2 Test Center of Excellence, while the
existing ATTJ main factory will be exclusive for assembly and other non-Final Test operations. This
initiative allows growth opportunities for both ATTJ manufacturing buildings for customer supply
assurance.
器件 Datasheet 文档搜索
AiEMA 数据库涵盖高达 72,405,303 个元件的数据手册,每天更新 5,000 多个 PDF 文件