Datasheet 搜索 > 逻辑芯片 > ON Semiconductor(安森美) > MC74HC00ADTR2 数据手册 > MC74HC00ADTR2 其他数据使用手册 1/13 页


¥ 0.561
MC74HC00ADTR2 其他数据使用手册 - ON Semiconductor(安森美)
制造商:
ON Semiconductor(安森美)
分类:
逻辑芯片
封装:
TSSOP-14
描述:
四2输入与非门高性能硅栅CMOS Quad 2−Input NAND Gate High−Performance Silicon−Gate CMOS
Pictures:
3D模型
符号图
焊盘图
引脚图
产品图
页面导航:
功能描述在P1
导航目录
MC74HC00ADTR2数据手册
Page:
of 13 Go
若手册格式错乱,请下载阅览PDF原文件

Issue Date: 02-Dec-2008 Rev.07-31-07 Page 1 of 13
INITIAL PRODUCT/PROCESS CHANGE NOTIFICATION
Generic Copy
02-Dec-2008
SUBJECT: ON Semiconductor Initial Product/Process Change Notification #16178
TITLE: Initial Notification for Transfer of High Speed Logic Integrated Circuits Die Manufacturing
from ON Semiconductor Piestany (Slovakia) to Tower Semiconductor Israel.
PROPOSED FIRST SHIP DATE: 02-Apr-2009
AFFECTED CHANGE CATEGORY: ON Semiconductor Fab Site
AFFECTED PRODUCT DIVISION: Standard Logic Products
FOR ANY QUESTIONS CONCERNING THIS NOTIFICATION:
Contact your local ON Semiconductor Sales Office or Won Kang <Won.Kang@onsemi.com
>
NOTIFICATION TYPE:
Initial Product/Process Change Notification (IPCN)
First change notification sent to customers. IPCNs are issued at least 120 days prior to implementation
of the change. An IPCN is advance notification about an upcoming change and contains general
information regarding the change details and devices affected. It also contains the preliminary
reliability qualification plan.
The completed qualification and characterization data will be included in the Final Product/Process
Change Notification (FPCN).
This IPCN notification will be followed by a Final Product/Process Change Notification (FPCN) at
least 90 days prior to implementation of the change.
DESCRIPTION AND PURPOSE:
May 14, 2008 - ON Semiconductor (Nasdaq: ONNN), has announced plans to close its two
wafer manufacturing facilities located in Piestany, Slovakia, and transfer the production lines
to other facilities. The targeted close date is Q1 2009.
Description of the change:
The transfer and qualification of the High Speed Logic CMOS process and the associated
integrated circuits from the ON Semiconductor Piestany facility (Slovakia) to Tower
Semiconductor Ltd. Israel.
Tower Semiconductor Ltd. is certified according to the ISO/TS16949 standard.
High Speed Logic product family is being transferred to Tower Semiconductor, and will
achieve the same electrical and reliability performances as the Piestany wafer fab. The
transfer includes a process change to the previously qualified 0.6u CMOS process.
器件 Datasheet 文档搜索
AiEMA 数据库涵盖高达 72,405,303 个元件的数据手册,每天更新 5,000 多个 PDF 文件